Talk:Source 2/Docs/Level Design/Prefabs and Instances: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
|||
Line 1: | Line 1: | ||
{{discussion page}} | |||
Map relays are currently listed in the "outputs" menus using the order in which they were created (making long relay lists difficult to manage)...is there any way to influence this without deleting/recreating the relays? If so, please update [[Dota_2_Workshop_Tools/Level_Design/Prefabs_and_Instances]]. | |||
== Is the Order of map relays listed in "my output named" and "via this input" drop-down menus changeable? (Object Properties > Outputs) == | |||
{{Message | |||
|user=Ryks | |||
|time=21:50, 30 Jan 2023 | |||
|Map relays are currently listed in the "outputs" menus using the order in which they were created (making long relay lists difficult to manage)...is there any way to influence this without deleting/recreating the relays? If so, please update [[Dota_2_Workshop_Tools/Level_Design/Prefabs_and_Instances]]. | |||
}} |
Revision as of 15:35, 4 February 2023

This is the discussion page of Source 2/Docs/Level Design/Prefabs and Instances.
To add a comment, use the Edit button near the headline of the appropriate section. To create a new section, you can use the Add topic button at the top of this page.
Comments on talk pages should be signed with "~~~~", which will be converted into your signature and a timestamp.
Comments on talk pages should be signed with "~~~~", which will be converted into your signature and a timestamp.
(using Template:Message) Map relays are currently listed in the "outputs" menus using the order in which they were created (making long relay lists difficult to manage)...is there any way to influence this without deleting/recreating the relays? If so, please update Dota_2_Workshop_Tools/Level_Design/Prefabs_and_Instances. --Ryks (talk) 21:50, 30 Jan 2023 (UTC)