== | == 27th November, 2008 == | ||
Work on the mod begins. | Work on the mod begins. | ||
== 30th November, 2008 == | |||
The corridor leading to the ladder leading to the exterior is finished. The first exterior bit is almost finished, with 2 custom giant Black Mesa decals on the compound wall, and red rock surrounding the gravel/rock floor. |
Revision as of 09:58, 30 November 2008
27th November, 2008
Work on the mod begins.
30th November, 2008
The corridor leading to the ladder leading to the exterior is finished. The first exterior bit is almost finished, with 2 custom giant Black Mesa decals on the compound wall, and red rock surrounding the gravel/rock floor.