Talk:Lost Soul (Source): Difference between revisions

From Valve Developer Community
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
== 28th November, 2008 ==
== 27th November, 2008 ==
Work on the mod begins.
Work on the mod begins.
== 30th November, 2008 ==
The corridor leading to the ladder leading to the exterior is finished. The first exterior bit is almost finished, with 2 custom giant Black Mesa decals on the compound wall, and red rock surrounding the gravel/rock floor.

Revision as of 09:58, 30 November 2008

27th November, 2008

Work on the mod begins.


30th November, 2008

The corridor leading to the ladder leading to the exterior is finished. The first exterior bit is almost finished, with 2 custom giant Black Mesa decals on the compound wall, and red rock surrounding the gravel/rock floor.