Talk:Cables and Ropes: Difference between revisions
Jump to navigation
Jump to search
(Fun with Ropes) |
(question about rope resizing using the source code) |
||
Line 2: | Line 2: | ||
:Also affected by Rotor-wash and physics. | :Also affected by Rotor-wash and physics. | ||
:Some [http://www.akilling.org/download/akgexplosivecrate.zip fun] with ropes. --[[User:Mark WiseCarver|wisemx]] 10:08, 1 Jan 2006 (PST) | :Some [http://www.akilling.org/download/akgexplosivecrate.zip fun] with ropes. --[[User:Mark WiseCarver|wisemx]] 10:08, 1 Jan 2006 (PST) | ||
Anyone have any ideas about how to make a rope resize itself dynamically? I've added a pulley constraint, but when one of the objects is pulled towards the pulley, the rope goes slack. Basically with what I have now, the rope will resize itself longer, but will not resize itself shorter. I'm working with the source code, not Hammer. Thanks for any help. --[[User:Daktor|O]] 06:01, 16 Jul 2006 (PDT) |
Revision as of 06:01, 16 July 2006
So is wind the only way to make a rope move? --TomEdwards 06:57, 1 Jan 2006 (PST)
Anyone have any ideas about how to make a rope resize itself dynamically? I've added a pulley constraint, but when one of the objects is pulled towards the pulley, the rope goes slack. Basically with what I have now, the rope will resize itself longer, but will not resize itself shorter. I'm working with the source code, not Hammer. Thanks for any help. --O 06:01, 16 Jul 2006 (PDT)