File:Hdn drn0s downtown video.gif
Hdn_drn0s_downtown_video.gif (320 × 180 pixels, file size: 80.69 MB, MIME type: image/gif, looped, 4,066 frames, 2 min 16 s)
Note: Due to technical limitations, thumbnails of high resolution GIF images such as this one will not be animated.
It took over 60 hours to make in HAMMER EDITOR. It took at least 5 HOURS just to make the train. The fire escape and main block building textures had been reworked a lot and it features objects to throw never before seen in a map on The Hidden: Source (including saw blades, an entire car and a wheelbarrow) all compiled and built up within 10 days and tweaked around over a few weeks until finalization.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 23:29, 16 November 2021 | 320 × 180 (80.69 MB) | DrN0 (talk | contribs) |
- You cannot overwrite this file.
File usage
The following page links to this file: